Features
What is in the box.
27 features your engineers configure themselves, behind every solution on this site.
All features at a glance
Build
Your engineers build the screens the plant runs on, without code.
- New board · AI assistant
A board for the evaporation shift: steam use, levels and open tasks.
Which units, and over the last shift or the last 24 hours?
EV-201 and C-210, last shift.
Changes made- Added four widgets
- Linked six tags
- Grouped by unit
EV-201Steam per tonne 2.38Level T-201 62%C-210ΔT trendOpen tasks 3AI app builder
Describe the board you need and the AI builds it: it asks a few questions, then lays out the widgets, data and groups. Ask for changes in plain words and it shows each one it made.
- Shift board · Day shift
Log entries
10:39 EV-201 steam per tonne high Deviation09:15 P-301 vibration checked, logged RoutineTasks
Weekly 5S, control room OpenShift OEE categorisation OpenInspection rounds
Daily walkdown, unit 2 OpenManual readings, unit 2 ClosedShift sign-off
Signed in 09:00 · Day shift lead Note: reactor to finish at 15:00No-code boards and views
Boards and custom views built from widgets, by your engineers, and changed the week they need to.
- Add a widget
- Trend
- KPI
- Gauge
- Table
- Form
- Task list
- Process diagram
- Bar chart
- Logbook
More than 50 widgets
Trends, KPIs, gauges, tables, forms, task lists and process diagrams, ready to place on any board.
- Evaporation · live
Process diagrams
Live process graphics of your units, with equipment, flows and values from the historian.
- Form · P-301 weekly inspectionFields
- Number
- Choice
- Photo
- Signature
- Text
Coupling guard in place Yes No1 photo attached Signed · Shift A · 06:42Forms
Inspections, approvals and permits as forms your engineers build once and reuse across sites.
- Task templateWeekly pump check
- Vibration reading
- Bearing temperature
- Guard and coupling
Every MondayRotating shiftEvaporation pumpsGeneratedMon 13 Jul P-301 Shift AMon 13 Jul P-302 Shift AMon 20 Jul P-301 Shift BMon 20 Jul P-302 Shift BTask templates
Routines and checks defined once, then scheduled by shift, site or asset.
- CalculationsSteam per tonne 3 sites
EV-201.steam ÷ EV-201.product5.47 t/h÷2.30 t/h= 2.38 t/t+8% normal Normal 2.20 t/t0.41 t/h extra steam × €50/t ≈ €21/h- Yield 96.1 %
- Energy per tonne 1.84 MWh/t
- OEE 78 %
Calculation library
Your own formulas, from yield to energy per tonne, run on live data and reused across sites.
Analyse
From a number on a board to the reason behind it.
- Analysis · Evaporation · 7 days
AI summary Since Monday, FIC-220 has started to oscillate and EV-201 steam per tonne is 8% above normal.
EV-201 steam per tonneC-210 temperature gapFIC-220 flowFIC-220 valve positionControl-loop check · FIC-220Oscillation Yes, about every 4 minSaturation NoValve or tuning Valve problem more likelyAnalysis workspace
Trends and analysis on one canvas. Search the history by value and drag charts into a grid. Control-loop checks find oscillation and saturation, and tell a valve problem from a tuning problem. Save the layout as a template for the next unit. With your AI service switched on, an AI summary says what has changed since you last looked.
Process data analytics → - Energy · drill-down · 24 h
- Total energy 5.32 MWh
- Line 1 2.22 MWh
- Line 2 2.24 MWh
- Distillation column 0.86 MWh
- Compressor 1 0.29 MWh
- Compressor 2 · above normal 0.57 MWh
Parameter drill-down
From a site total to the line, the column and the compressor behind it, in a few clicks.
-
- EV-201 · what feeds it
Strong contribution Weak contribution Cause-and-effect flow
Every flag shows the plant around it: what feeds the equipment and what it feeds, with the most likely cause highlighted and each link shaded by how much it contributed.
- Batch R1-1912 against the best 20Best 20 This batch Downtime
- Downtime · feed pump · Step 3 28 min
- Downtime · waiting for lab · Step 3 14 min
Batch and loss analysis
Batches compared step by step, with downtime and losses overlaid on the process trend.
AI
AI that drafts and gathers. People decide, and every figure comes from the engine.
- Ask the plant
Which equipment is costing us most this week?
EV-201. Steam per tonne is 8% above normal, about €21 an hour 1. It started after the cleaning interval moved from four to six weeks 2; the root-cause analysis confirms it 3.
- Flag EV-201, week 28
- Logbook, 14 March: cleaning interval changed
- Root-cause analysis, EV-201
AI chat
Questions in plain language, answered from your own records, with every source cited.
- Root-cause analysis · EV-201
- ✓ Flag raised Engine
- ✓ Evidence gathered AI step AI
- ✓ Cause confirmed: five whys Process engineer Sign-off
- 4 Approve action: four-week clean Area manager · waiting for approval Sign-off
- 5 Result verified Engine, after one cycle
AI workflows
Workflow steps where AI gathers the evidence or drafts the summary or action, then hands it to a person to approve.
- Agent · Evidence gatherer
Role Gathers the evidence behind a flag and drafts a summary for the engineer.
Tools · read-only Read historian trendsRead the logbook and roundsRead work ordersSearch past root-cause analysesCannot Write a setpointClose a taskApprove an actionAgents
A role plus the read-only tools it may use. Agents gather evidence and draft work; none can change anything in the plant.
How the agents work → - AI handover briefing · Night shiftCritical · read first
EV-201 steam use 8% above normal; action approved, not yet done.
Drafted from 14 log entries, 6 tasks and 2 roundsTop priorities- Confirm the EV-201 clean is booked for Thursday.
- Check P-301 alignment after the coupling work.
Outstanding work 3 open tasks · 1 round due 06:00Watch-outs FIC-220 oscillating since 06:10; the valve is the likely source.AI handover briefing
The incoming shift's priorities, open work and watch-outs, drafted from what the outgoing crew recorded.
Run
The work itself: tasks, workflows and the people doing them.
- Tasks · EvaporationTo do 2Check P-301 alignment after coupling work JM Due 14 JulCheck TT-212 calibration on C-210 AK Due 17 JulIn progress 1From a flag Return EV-201 clean to four weeks MK Due 13 JulDone 2Confirm cause, EV-201 MK DoneMorning round, unit 2 SD Done
Task management
Routine, non-routine and improvement actions in one list, with owners, due dates and a view of who is overloaded.
- Permit to work · P-3013 of 6 approved
- ✓ Request raised Operator
- ✓ Isolations confirmed Shift lead
- ✓ Gas test passed HSE
- 4 Area approval Area manager · waiting
- 5 Work complete Maintenance
- 6 Handed back Operator
Workflows
Work that takes several steps, with an approval at each one and live progress for everyone.
- Scheduled jobs
- Historian sync Every 5 minutes 2 min ago
- Daily cost report, emailed Daily · 06:00 Today 06:00
- Weekly pump check tasks Mondays · 05:00 Mon 6 Jul
- Monthly OEE report 1st of the month · 07:00 1 Jul
Scheduled jobs
Reports, data syncs and routine tasks that run on time, without anyone having to remember them.
- Notifications
- Flag raised: EV-201 steam per tonne To Process engineer · Desk
- Task due Thursday: realign P-301 To Maintenance · Phone
- Round out of spec: safety checklist To Shift lead · Tablet
- Approval waiting: four-week clean To Area manager · Phone
Notifications
Alerts and tasks that reach the right person, on a desk, a tablet or a phone.
- 09:38Operator roundsShift A · Operator round Submitted Done 06:40Shift A · Safety checklist Submitted Done 07:05 ▲ 1 out of specShift B · Operator round Assigned Due today
Mobile and offline
Cyzag Field for rounds, tasks and forms, offline on certified handhelds; Cyzag Mobile for the whole platform.
Govern
Who can see and change what, and a record of everything they did.
- Access · North plant › Evaporation
Operator Process engineer Area manager View boards ✓ ✓ ✓ Log entries ✓ ✓ ✓ Edit boards – ✓ ✓ Approve actions – – ✓ Role-based access
What each person can see and change follows their role, site and unit.
- Audit trail · EV-201 deviation
- Action approved: four-week clean 10 Jul 13:49·Area manager
- Cause confirmed; task assigned 10 Jul 12:32·Process engineer
- Status: New → Under review 9 Jul 16:07·Process engineer
- Flag raised: EV-201 steam per tonne 9 Jul 14:30·Engine
Audit trail
Every entry and every change time-stamped and attributed, ready for an investigation or an audit.
- Electronic sign-off
- Record
- Action: return EV-201 clean to four weeks
- Signed by
- Area manager
- Meaning
- Approved
- Time
- 10 Jul 2026 · 13:49
Signed electronically Kept with the record and its audit trailElectronic sign-off
Approvals and confirmations signed electronically, with full traceability.
Connect
Read-only, and never a write to your control system. Your historian stays, SAP stays.
- Connections · historianAVEVA PI Your historian, unchangedRead-onlyCyzag 1,240 tags · 2 s agoAlso connects to
- GE Proficy Historian
- Aspen IP.21
- Canary
- TimescaleDB
- InfluxDB
Historians
AVEVA PI, GE Proficy Historian, Aspen IP.21, Canary, TimescaleDB and InfluxDB.
What it connects to → - Connections · systems
- SAP → Tasks Work orders
- AVEVA MES → Batch analysis Batches
- SQL Server → Forms and quality Lab results
- Azure → Analysis Plant data
MES, ERP and data platforms
AVEVA MES, Proficy Plant Applications, aspenONE, SAP, Microsoft SQL Server and Azure.
What it connects to → - REST API
GET /flags?area=evaporation{ "tag": "EV-201", "issue": "Steam per tonne 8% above normal", "status": "Action approved", "eurPerHour": 21 }- Power BI
- Power Apps
- Your own tools
REST API
For anything else your plant runs, and for Power BI and Power Apps.
Start here
See it built on your own plant.
Start with a working session: your engineers and ours, on your plant's own problems.