Cyzag

Cyzag Operations

Runs the shift, and keeps the record of what fixed things.

Handovers, rounds, losses and quality on one screen, recorded as the crews work.

Shift board · Day shift

Log entries

10:39 EV-201 steam per tonne high Deviation
09:15 P-301 vibration checked, logged Routine

Tasks

Weekly 5S, control room Open
Shift OEE categorisation Open

Inspection rounds

Daily walkdown, unit 2 Open
Manual readings, unit 2 Closed

Shift sign-off

Signed in 09:00 · Day shift lead Note: reactor to finish at 15:00

The shift board: log, tasks, rounds and sign-off on one screen

Six modules

Start with the one that hurts most.

Each stands alone, and all share one record.

  • Shift

    Handovers, logs, tasks and KPIs in one workspace

    The log, open tasks and the shift's numbers in one place.

    Shift logbook and handover →
  • Rounds

    Structured digital inspections and operator rounds

    Rounds on a phone, offline; out-of-range readings flagged on the spot.

    Operator rounds →
  • Improve

    Capture ideas, investigate root causes, track results

    Ideas, investigations and actions, tracked to closure.

    Root cause and continuous improvement →
  • OEE

    Production losses, made visible and ranked

    Losses ranked by size and traced to the shift entry behind them.

    OEE and production losses →
  • Process Efficiency

    Energy and material cost, connected to daily actions

    Energy and material per tonne, shift by shift, tied to what the crew did.

    Process efficiency and energy →
  • Quality & Care

    Quality, safety and compliance in one system

    Deviations, safety observations and checks, captured and closed with evidence.

    Quality, safety and compliance →

AI in the shift

The briefing, written before anyone arrives.

Handover summaries and morning briefings drafted from what your crews recorded. For the process itself, see Cyzag Intelligence.

AI handover briefing · Night shift
Critical · read first

EV-201 steam use 8% above normal; action approved, not yet done.

Top priorities
  1. Confirm the EV-201 clean is booked for Thursday.
  2. Check P-301 alignment after the coupling work.
Outstanding work 3 open tasks · 1 round due 06:00
Watch-outs FIC-220 oscillating since 06:10; the valve is the likely source.
Drafted from 14 log entries, 6 tasks and 2 rounds

On the floor

Where the round happens, and where the engineer digs in.

09:38
Operator rounds
Shift A · Operator round Submitted Done 06:40
Shift A · Safety checklist Submitted Done 07:05 ▲ 1 out of spec
Shift B · Operator round Assigned Due today

Rounds on a phone, offline

Energy · drill-down · 24 h
  • Total energy 5.32 MWh
  • Line 1 2.22 MWh
  • Line 2 2.24 MWh
  • Distillation column 0.86 MWh
  • Compressor 1 0.29 MWh
  • Compressor 2 · above normal 0.57 MWh

Parameter drill-down: from a KPI to the asset behind it

How the two products meet

The best source, not a required one.

Cyzag Intelligence reads from whatever you already run. Operations is never a condition of entry.

But it is the richest source

Handovers, rounds and investigations, captured as teams work: what was tried, by whom, and whether it held. It is the record the agents read first.

Start here

Start with Operations, or start with Intelligence. The order is yours.

Start with a working session: your engineers and ours, on your plant's own problems.