Cyzag

OEE software built for process manufacturing.

Most OEE tools were built for discrete lines and fit process plants badly. Cyzag calculates OEE from your data and models the plant as it really runs.

Delivered by Cyzag OperationsCyzag Intelligence

Batch R1-1912 against the best 20
Best 20 This batch Downtime
  • Downtime · feed pump · Step 3 28 min
  • Downtime · waiting for lab · Step 3 14 min

A batch against the best 20, with the downtime that cost it time

What it does

Six things it does.

Built with Calculation libraryParameter drill-downBatch and loss analysisTask management

  • Calculated, not typed in

    Calculated from historian and MES data; losses generated for the crew.

  • Continuous and batch

    Rate losses, grade changes and batch steps modelled properly.

  • Losses ranked by size

    The biggest loss first in the morning meeting.

  • Traced to the shift that explains it

    Each loss linked to the shift entry that explains it.

  • Root cause, then action

    Five whys, fishbone and A3 started from the loss.

  • OEE beside cost

    OEE beside energy and steam, on one screen.

How it works

How it works, in four steps.

  1. 1 Read-only connections bring in run status, rates and quality data from the historian and MES.
  2. 2 Your engineers model the lines and units and set the loss categories.
  3. 3 OEE and losses are calculated automatically; operators classify and comment on them.
  4. 4 Losses feed daily meetings, root-cause work and improvement actions.
Who does what
Published result · Cyzag Operations 23 plants live within six months Nouryon, a global specialty-chemicals group Read the story →
Where it runs
  • Read-only connections to your historian, MES and SAP
  • Deployed on site or in your own tenant
  • Configured by your engineers, with no code
  • An audit trail on every record
What it connects to →

Questions

What buyers ask us.

How do you handle OEE in continuous processes?

Rate and performance losses are measured against the plant's own rates, and stops, slowdowns and off-spec production are classified in categories that fit the process, not a discrete-line template.

Does it work for batch operations?

Yes. Batch steps, durations and losses are tracked batch by batch, alongside batch comparison against the best runs.

Do operators have to type in every loss?

No. Losses are generated from the data; operators classify and explain them, which is what keeps them engaged.

Can we use our own loss tree?

Yes. Loss categories and reasons are configured by your engineers and can follow your existing standard.

How quickly can it roll out across sites?

Nouryon's rollout reached 23 plants within six months, with one set-up reused across sites.

Start here

See it on your own plant.

Start with a working session: your engineers and ours, on your plant's own problems.